TeachBeyond Brazil
Campus Renewal
The facilities are aging and in urgent need of repair to meet building and health codes and avoid being closed. Thousands are reached annually.
The facilities are aging and in urgent need of repair to meet building and health codes and avoid being closed. Thousands are reached annually.
Project cost: $10,000.00
Structural Improvements:
Total: R$ 300,000.00
Need for Reserve Fund: R$ 300,000.00
Total: R$ 600.000,00 = US$155,901.00; CAD$ 206,840.00
1 Brazilian Real (R$) = 26¢ US
1 Brazilian Real (R$) = 34¢ Canadian
Structural Improvements:
- Boiler, hydraulic structure and heating: R$ 120.000,00
- Water Tank: R$ 20,000.00
- Furniture, chairs, tables: R$ 30.000,00
- Bathroom renovations: R$ 70,000.00
- Household utilities (bed, table and bath): R $ 30,000.00
- Painting: R$ 30,000.00
Total: R$ 300,000.00
Need for Reserve Fund: R$ 300,000.00
Total: R$ 600.000,00 = US$155,901.00; CAD$ 206,840.00
1 Brazilian Real (R$) = 26¢ US
1 Brazilian Real (R$) = 34¢ Canadian